OMNiGRC - Connected GRC Platform

Calibrated Risk RegistersDirectly Connectedto Assets

Maintain continuous risk registers with calibrated 5×5 Likelihood × Impact scoring mapped directly to tracked infrastructure assets.

Tracked Risks142100% bound
Asset Coverage94.2%Asset linked
Recalc Latency< 1.2sLive sync
omni-risk-engine-daemon
v3.42-hotpatch

EVENT RECORDED #4419

AWS KMS rotation verified: Risk score calibrated for AST-059

Auto-Evidence Ledger attached
Dynamic Risk Calibration(Illustrative Demo Data)

Interactive 5×5 Likelihood × Impact Heatmap

Calibrated 5×5 Likelihood × Impact matrix reflecting direct Asset-to-Risk linkage. Click any cell to inspect risk scoring.

5x5 Likelihood × Impact Scoring
Likelihood vs. Impact(1 = Minor, 5 = Catastrophic)
Low Med High Crit
Likelihood
Impact (1 = Minor • 5 = Catastrophic)
RSK-042Detail Drawer
MITIGATE

Database Backup Restoration Failure

Dynamic risk scenario calibrated via real-time telemetry from associated assets.

Calibrated Risk Score
16[4 Likelihood × 4 Impact]
Linked AssetAST-059
Risk OwnerP. Dev
Audit Evidence Recordev-drill-2026.json
Workflow Automation:Simulates telemetry recalculation
Operational Treatment Taxonomy

The Four Core Risk Treatments, Automated

Every quantified entry in OMNiGRC is bound to an actionable, legally defensible treatment path. No ambiguity, no neglected risks forgotten in spreadsheets.

Control Safeguards

STRATEGY: MITIGATE

Direct mapping to technical, physical, or administrative controls with continuous test verification and dynamic score suppression.

Active: 104 RisksContinuous API checks

Executive Sign-Off

STRATEGY: ACCEPT

Formal risk acceptance with documented business justification, non-delegable CISO authorization, and strict expiration date alerts.

Active: 18 Risks90-day review cycles

Contractual Offload

STRATEGY: TRANSFER

Cyber insurance underwriting and third-party vendor indemnification contracts linked directly into our automated Vendor Inventory.

Active: 12 RisksSLA policy linked

Sunset & Decommission

STRATEGY: AVOID

Permanently eliminating exposure by terminating high-risk microservices, unmaintained legacy software, or risky geographical routes.

Active: 8 RisksTear-down completed
Dynamic Architecture

Continuous Calibration vs. Annual Stagnation

Annual or quarterly audit checklists hide the fact that security controls fail unpredictably between review intervals. OMNiGRC turns risk scoring into an autonomic nervous system.

The Static Spreadsheet Problem

Scores freeze in Excel spreadsheets for 12 months. When a WAF rule is misconfigured or a key backup script silently fails, your residual risk stays green while production sits defenseless.

The OMNiGRC Real-Time Engine

When telemetry detects state change at 03:15 UTC, RSK-042 risk score immediately updates to 16 (High) and posts an entry to the append-only audit log.

Append-Only Audit Logging
audit_log_stream = active

SELECT timestamp, risk_id, new_score, trigger_event, user_id FROM omni_risk_audit_stream LIMIT 4;

2026-03-30 08:41:12 UTCRSK-042
16 → 4[CTRL-012 PASS]sig: p_dev_lead
2026-03-30 04:12:05 UTCRSK-029
12 → 3[CTRL-015 REMEDIATED]sig: auto_bot
2026-03-29 23:19:40 UTCRSK-009
8 → 20[VPC DRIFT DETECTED]sig: daemon_alert
2026-03-29 17:02:11 UTCRSK-078
6 → 2[SCIM SYNC SUCCESS]sig: d_chen_eng
Log Sequence ID: seq_8c37f_91aa4 Append-Only Audit Trail
Total Ecosystem Interoperability

The Continuous Assurance Lifecycle

How an identified risk traverses every workflow module inside OMNiGRC, turning raw technical signals into indisputable audit evidence.

01 / DISCOVERY

Risk Identified

Threat modeled or ingested via threat feeds.

RSK-042
02 / MAPPING

Asset Linked

Direct Asset-to-Risk linkage for targeted impact evaluation.

AST-059
03 / QUANTIFY

Vulnerability Scored

CVSS / EPSS factors calibrate inherent score.

Score: 16 (High)
04 / DEFENSE

Control Mitigated

Automated tests suppress residual likelihood.

CTRL-012 PASS
05 / POSTURE

Compliance Board

ISO 27001 Annex A.8.13 reflected as Green.

Status: 99.4%
06 / VERIFIED

Auditor Evidence

Recorded evidence status stored in Evidence Vault.

ev-drill-2026
Auditor Portal Integration

Zero Friction External Audits

Provide read-only auditor scopes directly tied to cryptographic evidence hashes, eliminating spreadsheet emails.

Automated CAPA Remediation

Closed-Loop Incident Resolution

When automated tests detect policy drift, CAPA tickets auto-dispatch directly to Jira, GitHub, or ServiceNow.

Tired of maintaining stale risk spreadsheets?

Request a tailored walkthrough with our technical architects to see your AWS, GCP, and GitHub assets mapped into a dynamic 5x5 matrix within 48 hours.

How to Build an Effective Cybersecurity Risk Register

Step-by-step methodology for identifying, assessing, and managing digital risks.

Read Guide →